planing the pony wall to fit squarely to the back wall |
planing the bathroom window opening square |
new bathroom window installed |
drywalling around the new shower |
filling the drywall |
continuing to build the pony wall after attaching it in place |
pony wall woodworking done (for now). (note the sloping shower floor) |
drywall primed around the shower |
Lyle cuts waterproofing membrane in the front yard |
|
Lyle mixes mortar |
mortar (thinset) |
applying mortar |
applying the waterproof membrane (Kerdi) |
waterproofing the pony wall |
oops, we forgot the shampoo bottle cubby! |
just kidding; we cut and folded the membrane into the cubby |
the back wall is done (for now) |
view from hallway |
Sparkles inspects the worksite |
starting to Kerdi the control wall |
halfway done |
old-school mixer valves |
all the fancy bits |
funky! |
the floor membrane goes on |
sealing the corner |
sealing the vertical |
we put Kerdi under the curb |
the curb is built with brick |
wrapping the face of the curb with that under-layer of Kerdi |
all the dimensions of the shower are now defined |
|