Some pictures of one of the many stages of our bathroom renovation.
    planing the pony wall to fit squarely to the back wall     planing the bathroom window opening square     new bathroom window installed     drywalling around the new shower     filling the drywall     continuing to build the pony wall after attaching it in place     pony wall woodworking done (for now).  (note the sloping shower floor)     drywall primed around the shower     Lyle cuts waterproofing membrane in the front yard         Lyle mixes mortar     mortar (thinset)     applying mortar     applying the waterproof membrane (Kerdi)     waterproofing the pony wall     oops, we forgot the shampoo bottle cubby!     just kidding; we cut and folded the membrane into the cubby     the back wall is done (for now)     view from hallway     Sparkles inspects the worksite     starting to Kerdi the control wall     halfway done     old-school mixer valves     all the fancy bits     funky!     the floor membrane goes on     sealing the corner     sealing the vertical     we put Kerdi under the curb     the curb is built with brick     wrapping the face of the curb with that under-layer of Kerdi     all the dimensions of the shower are now defined